Underwater Pipelines

Preliminary design of tension leg platform – North Sea

760 meters

Length of Quay Wall

13 Berths

Number of Ro-Ro Berths

24 Months

Construction Duration

Client

BLOHM+VOSS AG

Location

Germany

Project Duration

06.1987–12.1988

Position

Research Engineer

Sector

Underwater Pipelines

Budget

Project Description

The project involved the preliminary design of a tension leg platform for the North Sea at water depths up to 350m. The role included research and engineering contributions to the design process.

Services Provided