The project involved the preliminary design of a tension leg platform for the North Sea at water depths up to 350m. The role included research and engineering contributions to the design process.
Length of Quay Wall
Number of Ro-Ro Berths
Construction Duration
BLOHM+VOSS AG
Germany
06.1987–12.1988
Research Engineer
Underwater Pipelines
The project involved the preliminary design of a tension leg platform for the North Sea at water depths up to 350m. The role included research and engineering contributions to the design process.