Railways and Metro

PM/CM services for Riyadh Metro Project (Lines 4,5,6)

760 meters

Length of Quay Wall

13 Berths

Number of Ro-Ro Berths

24 Months

Construction Duration

Client

Riyadh Development Authority

Location

Saudi Arabia

Project Duration

02.2016–10.2016

Position

Senior Project Manager for line 4

Sector

Railways and Metro

Budget

€7.850.000.000

Project Description

As Senior Project Manager for Line 4 of the Riyadh Metro Project, responsibilities included leading a team of 140 professionals to deliver 27.9 km of metro line, one depot, and 7 stations (2 underground, 5 elevated). The project required strict adherence to time, cost, and quality requirements.